Judge: Cherol J. Nellon, Case: 23STCV06723, Date: 2024-02-08 Tentative Ruling
Case Number: 23STCV06723 Hearing Date: February 8, 2024 Dept: 14
Rudski v. IB Construction
Case Background
Plaintiffs allege they hired
Defendants to renovate a house in Silver Lake, but that Defendants did a poor
job, requiring Plaintiffs to hire a second contractor.
On March 28, 2023, Plaintiffs filed
their Complaint for (1) Breach of Written Contract, (2) Breach of Implied
Warranty, and (3) Breach of Oral Contract against Defendants IB Construction (“IBC”),
David Balmas (“David”), Ishak Balmas (“Ishak”), Asaf Balmas (“Asaf”), and DOES
1-25.
On June 16, 2023, Defendants David,
Ishak, and Asaf filed their respective Answers.
On August 7, 2023, the default of
Defendant IBC was entered.
No trial
date has yet been set.
Instant Motion
Defendants
David and Ishak now move this court for an order permitting them to file a
Cross-Complaint.
Decision
The motion
is GRANTED. Defendants are to file their Cross-Complaint by February 15, 2024.
The motion
is unopposed. The lack of an opposition operates
as a concession that the motion has merit. See California Rules of Court
Rule 3.1113(a); see also Rule 3.1320(f); Herzberg v. County of Plumas
(2005) 133 Cal.App.4th 1, 20.